Services
Install it. Test it. Keep the report.
Stationary battery work for the facilities that notice immediately when a string is weak. Most of it is VRLA and flooded lead-acid. If a site is moving to lithium, we talk through the room and the cutover before anyone orders jars.
01
Data center installs
A data hall does not get a second chance at a cutover. We replace and install UPS battery strings around the equipment that is already carrying the building: cabinet systems and open-rack VRLA, flooded jars where the room is actually built for them. Polarity, torque, and cable dress are documented. Spent cells leave with the crew for recycling instead of sitting on a pallet by the dock.
- String replacements and new UPS battery installs
- Cutover planned around bypass or a remaining string
- Labeling that matches the one-line
- Removal and recycling of spent batteries
02
Cell towers & telecom
Cell sites are tight, hot, and a long drive from the shop. We install and swap 48-volt and 24-volt battery plants in shelters and cabinets, dress the cables so the next tech can work, and check the alarms before we lock the gate. Hardware for the job rides with the truck — a missing lug should not mean a second trip up the mountain.
- Shelter, hut, and rooftop battery replacements
- 48V and 24V DC plant string work
- Connector, cabinet, and alarm checks
- Remote Arizona sites, not only the Valley
03
Switchgear batteries
We work the stationary battery on smaller Eaton switchgear: a generator breaker, the module input breaker (MIB), the module output breaker (MOB), and the utility output breaker (UOB). Not a long lineup. Control power still has to close and trip every breaker when AC is gone, including 125-volt systems. Connections get inspected, chargers get checked, and you get a report instead of a shrug.
- Eaton switchgear control-power batteries
- Generator breaker, MIB, MOB, and UOB
- 125V DC and related stationary systems
- Connection, charger, and alarm verification
04
Testing & maintenance
Maintenance is the job that keeps an install from becoming a surprise. Visits cover what the battery type and the site actually need: a visual and connection inspection, float and cell voltages, internal resistance or impedance, specific gravity on flooded cells, charger settings, and alarms. Capacity and discharge testing when the spec or the contract calls for it. Every visit ends with a written report you can hand a customer, a carrier, or next year’s budget.
- Quarterly, semiannual, and annual contracts
- Voltage, impedance, and connection checks
- Capacity and discharge testing when required
- A written report after every visit
Also on the truck
The same habits, on the batteries that sit next to the big strings.
Emergency lighting
Battery units and central inverter batteries that have to light the path when the building goes dark.
Generator starting
Starting batteries that crank the set. A generator with a dead start battery is a very expensive sculpture.
Small UPS
Network closets and single-cabinet UPS systems, serviced with the same habits we use in the hall.
On a visit
What maintenance actually includes
- 01Visual inspection — jars, cases, leaks, ventilation, and the mess someone left last time
- 02Connections — intercell hardware, torque where it is called for, heat at loose joints
- 03Electrical — float voltage, cell or unit voltage, internal resistance or impedance
- 04Flooded cells — specific gravity and electrolyte level when the design allows it
- 05Charger and alarms — setpoints, equalize history, and whether the panel is telling the truth
- 06Discharge — capacity or a load-bank rundown when the contract or the spec requires proof
- 07The paper — a written report after every visit, not a verbal “looks fine”
Questions we get
- How often should a string be tested?
- It depends on the battery and how critical the site is. A lot of rooms land on a quarterly electrical check and a deeper look annually, with a capacity test when the manufacturer, the carrier, or your own standard requires it. We will say which cadence fits the room instead of selling the longest contract.
- Do you haul away the old batteries?
- Yes. Spent cells leave with the crew and go to recycling. We do not leave a pallet in the parking lot for someone else to discover in August.
- Can you work a live site?
- Cutovers are planned around the UPS, the bypass, or a remaining string. We do not pull the only thing holding the load.
- Where do you work?
- Home base is the West Valley. We cover Greater Phoenix and travel statewide — Tucson, the high country, and remote cell sites included.
- What are your hours?
- Monday through Friday, 9:00 to 5:00. Weekends by appointment. Call (602) 881-5014 and we will tell you when a crew can be on site.
Next step