
Power · Support · Uptime
When the utility drops, the battery is the plan.
Battery installation, testing, and maintenance for data centers, commercial facilities, and critical infrastructure across Arizona. Cell towers and switchgear included. The string is either ready, or it is not.
- West Valley
- Home base
- Statewide
- Including remote sites
- PM contracts
- Quarterly to annual
Services
Four things. Done properly.
The same crew that lands the jars comes back to test them. Install without maintenance is how strings die quietly.
- 01Data center installsUPS battery strings for server rooms, colo cages, and larger halls — installed so the load never finds out we were there.
- 02Cell towers & telecomBattery plants at shelters, huts, and rooftops. A failed string at a remote site is a dark sector, not a warranty ticket.
- 03Switchgear batteriesEaton gear, kept small. A generator breaker, MIB, MOB, and UOB. If the control battery is weak, none of them move.
- 04Testing & maintenanceQuarterly, semiannual, or annual programs. A battery that was fine at install is not a battery that is fine in an Arizona July.
How a job runs
Survey, install, prove it, stay on it.
01
Walk the site
Load, runtime, room temperature, the charger, and the jars that are already there. Arizona heat is part of the measurement, not a footnote.
02
Install clean
Torque, polarity, labels, and cable dress. Old cells come out. The room should look better than we found it.
03
Prove it
Voltages, resistance, and a discharge test when the application calls for one. We do not call a string good because it is new.
04
Stay on it
A contract on a cadence that matches the battery and how critical the site is. Same crew, same report format, no relearning the room.

Built for this climate
A spec sheet at 77°F is not an Arizona battery room.
Desert ambient cooks strings that were sized on a laboratory number. We look at the room you actually have — shelter, hall, or switchgear lineup — and plan float, ventilation, and replacement around that heat. Greater Phoenix is home. The rest of the state, including remote towers, is on the schedule.
- Peoria
- Glendale
- Phoenix
- Scottsdale
- Tempe
- Mesa
- Chandler
- Gilbert
- Surprise
- Goodyear
- Tucson
- Flagstaff
Where it goes

Data centers
Server rooms, colo, and enterprise halls where a few seconds of unprotected load is a real invoice.

Cell towers
Carrier shelters and remote sites. When the plant drops, the sector drops with it.

Switchgear
Smaller Eaton gear: generator breaker, MIB, MOB, and UOB. It still has to operate after the AC source is gone.
On the job
Strings in and strings out.

Monitoring leads on the string

Cabinet after the jars are in

Mid-swap, trays open

String dressed on the shelf

Spent jars coming out

Rack frame in the room

Shelves mid-swap

Shelf string, cables landed

UPS cabinet, jars in

A few positions still open
Government work
Registered to bid.
Critical Facility Solutions LLC is actively registered in SAM.gov. Solicitations go to the bids address.
- Legal name
- Critical Facility Solutions LLC
- Unique Entity ID
- HQRDWXPEZHG8
- CAGE code
- 26QL2
Next step