Industries

Rooms that cannot go dark.

Data halls, carrier shelters, and switchgear lineups. Different gear, same failure: a battery nobody checked until the day it had to carry the site.

Aisle between two rows of facility switchgear
Open UPS battery cabinet with the jars installed

01

Data centers

Server rooms, colo, and enterprise halls where a few seconds of unprotected load is a real invoice.

We install and replace the UPS batteries those rooms depend on, and we test them on a schedule so runtime is a number you have measured — not a number from the year the string was commissioned.

Related service
A cell tower and equipment shelter in the Arizona desert at dusk

02

Cell towers

Carrier shelters and remote sites. When the plant drops, the sector drops with it.

Battery replacements, cabinet work, and maintenance for telecom DC plants across Arizona, including sites that are not a convenient drive from Phoenix.

Related service
Aisle between two rows of facility switchgear

03

Switchgear

Smaller Eaton gear: generator breaker, MIB, MOB, and UOB. It still has to operate after the AC source is gone.

Stationary batteries for the control power on that lineup. Install, replacement, and testing, with the connections and the charger treated as part of the system — not an afterthought.

Related service

The batteries next to the critical ones

Emergency lighting and generator starting batteries fail in the same outage the big string was bought to survive. We service those too — same documentation, smaller jar.

Emergency lighting

Unit equipment and central systems. If the path of egress depends on a battery, that battery gets the same inspection habit as the UPS downstairs.

Generator start

A set that will not crank is not standby power. Starting batteries are checked, replaced, and kept on the same maintenance conversation as the rest of the plant.

Next step

Tell us the site. We’ll tell you what the string needs.

Call (602) 881-5014